Tron Logo
Trade on HitBTC
Like this video

Milestones Minery

The Largest Legal Mining Compound In Russia

What is Minery? Minery represents a different solution. It combines large mining compounds, low entry criteria, high quality hosting, a service center in close vicinity and one of the lowest electricity rates in the whole world. We procure the hardware, install and set it up. In case of breakdowns we repair it right on the spot. These characteristics make the Minery project highly efficient and convenient. Where? When choosing location for mining, the ideal placement will offer both low electricity rates and low average annual temperature. Russia is one of the best countries to place a mining farm. Our mining compounds are located in the cities of: Bratsk, Ust-Ilimsk, Irkutsk. Average annual temperature –2°C. These climate conditions allow us to use highly effective heat transfer and cooling system for the miners and ultimately reduce hosting expenses. Power sources Our power supplier is Bratsk Electric Grid Company, JSC (BEGC) which is among the largest in the Irkutsk region.

2.7
1 0 expert ratings
Benchy 2.7
KYC
Experts
-
-
-
Review: coming soon PRO
Ended
Token
MNRY
Type
Price in preICO
1 MNRY = 1 USD
Price in ICO
1.0000 USD
Country
Whitelist/KYC
KYC
preICO start
15th Mar 2018
preICO end
30th Jun 2018
ICO start
1st Jul 2018
ICO end
30th Sep 2018
Visit ICO website
Report

Milestones

1
March 2018

Purchasing real estate, securing land rights, procuring hardware, continuing software development for mining compound management.

2
April 2018

Engineering, securing authorizations and approvals.

3
May 2018

Ordering electrical equipment, beginning groundwork, laying foundations for facilities 2-5. Facility 1: finishing work begins, internal supply lines installation.

4
June 2018

Facilities 2-5: finalizing groundwork and laying the foundation. Facility 1: finishing works, installing ventilation.

5
July 2018

Facilities 2-5: construction works, internal supply lines installation begins. Facility 1: finalizing engineering and finishing works, commissioning preparations, transformer substations installation.

6
August 2018

Facilities 2-5: finalizing engineering, commissioning preparations, transformer substations installation. Facility 1: finalizing transformer substations installation, utility connection and commissioning.

7
September 2018

Facilities 2-5: finalizing transformer substations installation, utility connection and commissioning. Facility 1: hardware installation and set-up. Finalizing software development for mining compound management.

8
October 2018

Facilities 2-5: hardware installation and set-up, token issuance.

Add to bookmarks
ICO KYC Report
Not conducted yet
KYC procedure verifies selected/specific team members only. It does not guarantee ICO success nor is a call for investment.
Missing or incorrect data? Let us know.

ICOs that might interest you

3.6

UCOIN

A new generation cryptocurrency, backed by an international financial ecosystem, design...

121 days 10 hours left
4.2

QUASA

First Open Blockchain Platform With Artificial Intelligence For Connecting People Revo...

3.8

HiveNet

HiveNet is a distributed cloud computing network, which enables computer owners to rent...

4.2

serenitysource

Serenity - energy on the GO! Serenity is a next-gen renewable energy retailer on blo...

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Learn more Got it