Modernization of existing production facilities and creation of new ones in two most promising directions are carried out in the city of Cherepovets, Vologda Region, in the territory of production site of LLC "ChPRP".
These processes include several stages and development vectors:
Manufacture of electric welded pipes within the scope of TESA 25-57 tube mill reconstruction. Implementation of the project includes creation of modern production complex for manufacture of a wide range of metal products - shaped and round tubes of various diameters and shape sizes made of zinc-coated cold-rolled workpieces.
Purchase and commissioning of high-efficiency TESA 10-60 tube mill.
Modernization of production site manufacturing large-diameter pipes (LDP) by creation of preparation park and increase of the park of processing (bending and forming) equipment of high efficiency, which will enable to expand the range of produced goods and to increase the volume and enhance the quality of products to be made on their basis. Implementation of the project includes creation of a modern industrial complex producing pipes of various diameters and shape sizes made of ordinary and alloyed steel grades, as well as of non-ferrous metals and titan.
Arrangement of production of elliptic, spherical dish-shaped and conic bottoms and fittings.
All ratings published on ICObench serve informational purposes only. ICObench does not provide investment forecast, recommendations or any consulting for that matter. Thus, neither ICObench, nor the experts can be hold responsible for the visitors’ investment decisions. Read more
Experts are independently and voluntarily contributing to the community. If no expert has rated the ICO, only ICO analyzer's results are used. Always research before investing as these ratings should not be taken as an investing guide of any kind.
Ratings and ICO analyzer results are being updated (re-calculated) every few hours.
1. Purchase of equipment set for manufacture of bottoms; 2. Designing and production of outfit, preparation of production facilities; 3. Purchase of required additional equipment; 4. Installation of equipment; 5. Starting-up and adjustment, commissioning.
Second stage ~ 5 413 000$
1. Purchase of plate-bending equipment; 2. Purchase of required additional equipment; 3. Preparation and reconstruction of production facilities; 4. Installation of equipment; 5. Starting-up and adjustment, commissioning.
Third stage ~ 3 615 800$
1. Purchase of high-rate TESA 10-60 unit; 2. Purchase of metallizing gun for processing of welds on zinc-coated pipes; 3. Purchase of a vertical storage capacity; 4. Preparation and reconstruction of production facilities; 5. Installation of equipment; 6. Starting-up and adjustment, commissioning.
Fourth stage ~ 4 980 000$
1. Purchase of equipment set for robotized automatic welding; 2. Purchase of high-precision equipment for cutting of metal rolls on preparation site; 3. Purchase of required additional equipment; 4. Preparation of production and storage sites, installation of equipment; 5. Starting-up and adjustment, commissioning.
Duration of every stage - 1 year. Stages can be carried out simultaneously and independently from each other.